SNE of Lebanon, Sarooj is building the marine works for the Wave, Muscat. The works consists of
This is a 270 Km long border to be marked with concrete monuments (on top of
Cyclone Gonu has severely damaged the marina at this important resort. The contract
The contract covers the design and construction of 45 Km of paved internal roads with all
Design and construction of 16 Km road of 8M wide road including Irish crossing Type 1, 2 & 3, protection
The works consist of extending an area for development into Sultan Qaboos Port in Muttrah. The area
Reconstruction of a exposed shoreline revetment of 300M long in Muscat Palace area. The reconstruction